How long does restumping take?

Total Restumping · Regional Victoria & Queensland · Updated July 2026

The on-site work is quicker than most people expect. The paperwork is what needs lead time. Realistic numbers:

On-site time

Before anyone crawls under the house

Allow a few weeks for the building permit and engineering computations (mandatory in Victoria) — timing varies by surveyor, and flood-prone blocks needing report & consent take longer. A well-run job overlaps this with scheduling so the crew starts as soon as the permit lands. Traditional concrete stumps can also add cure time before final lowering on some jobs.

Can you live in the house?

Almost always yes. The house is progressively supported on jacks; it doesn't hang in the air. Expect some noise, some bounce, a day without easy access to certain rooms, and short water/gas interruptions if lines need re-supporting. Most families stay put for the whole job.

What stretches a job

Ask every quoting contractor two questions: "How many working days on site?" and "Who lodges the permit and when?" Confident, specific answers are a quality signal.

Want a number for your house? The cost calculator gives a realistic range in 30 seconds, and a free inspection turns it into a fixed written quote.

Not sure if your stumps are the problem?

Try the 2-minute self-check, or book a free inspection — we'll tell you honestly if restumping can wait.

Run the stump self-check →