HomeGuides

Partial vs full restumping: the honest decision guide

Total Restumping · Regional Victoria & Queensland · Updated July 2026

Nobody should pay for a full restump when a partial will do — and nobody should pay for a partial twice when a full was the honest answer. Here's how the decision actually works.

When partial makes sense

When partial is false economy

The test an honest contractor applies

Condition-map every stump (sound / marginal / failed), then look at the pattern. Clustered failures with an identifiable cause → partial. Scattered failures across same-age stumps → the rest are following; full restump is the honest call. Make any quoting contractor show you their map — if they can't, they didn't really inspect.

Want a number for your house? The cost calculator gives a realistic range in 30 seconds, and a free inspection turns it into a fixed written quote.

Not sure if your stumps are the problem?

Try the 2-minute self-check, or book a free inspection — we'll tell you honestly if restumping can wait.

Run the stump self-check →